Drapehaus
Preparing the room
Drapehaus
Preparing the room
Season
October is when Goa comes back. Houses are reopened, properties are cleaned for the season, and a great many people discover simultaneously what four months of closure has done to their soft furnishings.
By the Drapehaus studio · 19 September 2026 · How we write

It is by some margin our busiest month, and that has a practical implication: if you want work done before the season starts, October is late to begin asking. The households that get sorted comfortably are the ones that made the decision in August.
Start by opening everything and letting the building dry for a few days before making any judgements. Fabric that looks and smells bad on day one is often substantially better after a week of airflow and sunlight, and it is a mistake to condemn things immediately.
Once dry, look for three things: mildew staining, which is usually permanent on natural fibres but sometimes treatable on synthetics; fibre weakness, tested by gently stressing the fabric at a hem; and hardware corrosion, especially at brackets and in mechanisms.
Be realistic about what is worth saving. A curtain with scattered spotting on a synthetic fabric can often be washed and kept. One that has been saturated for four months and feels papery at the hem has failed and will fail again.
Everything needs washing, including things that look clean. Four months of humid air deposits a lot of nothing-in-particular on fabric, and it dulls colour in a way that is only obvious once something has been cleaned next to something that has not.
Hardware wants a wipe or a rinse, particularly near the coast where salt will have built up regardless of whether the house was open. Mechanisms benefit from being operated through their full travel a few times.
This is also the moment to deal with any timber — shutters, wooden blinds, frames. Check for warping and for mud tubes, and treat before the dry season sets the damage.
Rather see it in your own room?
We bring samples to the house, measure every window, and specify for the light and exposure you actually have.
More on this — tap a heading to read
Everyone wants the same thing at the same time. Guesthouses are preparing for season, families are refreshing for Diwali, and villa owners are returning to find work needed. Workshop capacity across the state is at its tightest.
If your requirement is time-sensitive — rooms that must be lettable by November, a house that must be ready for a family visit — the order needs to be placed in August or early September, during the rains, when the workshop is quiet.
For anything not time-sensitive, October and November are perfectly reasonable, but expect longer lead times than at any other point in the year and plan accordingly.
The monsoon does not stop on 30 September, whatever the calendar in people's heads says. The India Meteorological Department revised its normal withdrawal date for the state capital to 14 October, and October still brings a meaningful amount of rain in an ordinary year, often as heavy afternoon storms. Heavy downpours in the first half of the month are normal rather than unusual.
Humidity falls more slowly than the rain does. Morning relative humidity in the state capital in October averages 86 per cent, against 91 in September, and it is not until December that afternoons become properly dry. The first fortnight of October is therefore a drying-out period rather than a working one.
In practice that means opening the house and airing it in early October, but holding off on washing large curtains until the weather has settled into a run of clear days. Fabric washed during a wet spell in the first week of October can take as long to dry as it would in August.
When curtains come down after the rains, look at the wall before looking at the fabric. A patch of dark staining or grey bloom on the plaster directly behind a curtain means moisture sat there for weeks, and rehanging a clean curtain against it simply restarts the problem. The wall has to be dealt with first, or the new season starts with the old problem still in place.
Older houses built in laterite with lime plaster hold moisture long after the rain stops, and they need to breathe it out. Painting over a damp patch with a sealing emulsion traps the water and pushes it sideways. The better approach is to let the wall dry fully, clean off surface growth, and repair with a compatible breathable finish.
Check the fixings at the same time. A plug set into damp laterite or crumbling plaster may have loosened over the season even if the bracket looks straight. Give each bracket a firm pull before the curtain goes back up, and reset any that move into sound material. It takes a few minutes per window and saves a fallen curtain in December.
Once everything is aired and washed, most curtains fall into one of three groups. Some are simply fine. Some have a sound face fabric and a failed lining, which is common because the lining faces the wall and takes the damp first. And some have lost structural strength and will not see another season.
Relining is worth considering when the face fabric is good and the curtain was well made. It keeps the heading, the pleats and the fabric you chose, and it is an opportunity to switch to a polyester lining that will cope better next year. The trade-off is that a relined curtain is only as good as its oldest part.
Replacement is the honest answer when the fabric feels papery, tears when stressed at the hem, or carries staining that has set into a natural fibre. Spending on repairs to a curtain in that condition usually means paying twice, because it will fail again at the next monsoon and the repair goes with it.
Coastal houses carry an additional layer of damage that inland ones do not. Salt settles on every surface near the sea, and through the monsoon it absorbs moisture from the air and stays wet. On fabric it leaves a faint stiffness and a tendency to reabsorb damp; on metal it is the main driver of corrosion.
Hardware near the sea should be wiped with fresh water, dried and then cycled. Aluminium track may show a white powdery deposit, which usually cleans off; steel will show rust, which does not. Motor housings and chains deserve particular attention, because salt that gets inside a mechanism shortens its life considerably.
Washing curtains after the monsoon removes the salt as well as the dust, which is a large part of why it is worth doing even when fabric looks clean. A curtain rehung with a season of salt still in it will feel damp to the touch on every humid evening of the dry season.
For a property with bookings starting in November, the order of work matters. Air the building first, then clean, then assess, then decide what must be replaced. Ordering replacements before the assessment is finished tends to mean ordering the wrong things, or ordering too much. A clear sequence also stops the same room being cleaned twice.
Anything that affects a guest's night — light control in bedrooms, blinds that work, fixings that hold — takes priority over anything decorative. A faded cushion can wait until December; a blackout blind that will not come down cannot. The pre-season rental page on this site covers that inspection in more detail.
Photographs for listings should be taken after the work is done rather than before, and in the clear light of late October or November. A room photographed in the grey of early October, with curtains still drying on a line, does the property no favours for the rest of the season.
Diagnosis
WhyJudged before the building had dried out. Fabric often recovers substantially after a week of air and sun.
FixOpen everything, air it for several days, then assess. Only then decide what has genuinely failed.
WhyFour months of humid air deposits a film on fabric that is invisible until something clean is placed beside it.
FixWash everything at the end of the season, including what looks fine.
WhyCorrosion and salt build-up over a season with no operation.
FixRinse or wipe hardware, then cycle every mechanism through its full travel several times.
WhyOctober is the busiest month of the year across the whole state and capacity is fully committed.
FixPlace time-sensitive orders in August or early September while workshops are quiet.
WhyIt went back against a wall that still held mould growth and moisture from the monsoon.
FixInspect and treat the wall behind every curtain first, and let old laterite and lime plaster dry out fully.
WhyThe rains had not finished. Normal withdrawal is mid-October and humidity stays high well beyond it.
FixAir the house first and wait for a settled run of clear days before washing anything large.
WhyThe face fabric had already lost strength, so the new lining outlived the curtain it was sewn to.
FixStress-test the face fabric at the hem before relining. If it tears or feels papery, replace instead.
Checklist
Air the house for several days before judging anything
Test fabric strength at hems, not just appearance
Wash everything, including what looks clean
Rinse hardware and cycle every mechanism fully
Check timber for warping and for mud tubes
Order time-sensitive work in August, not October
Wait for a settled run of clear days before washing large curtains
Inspect the wall behind every curtain before rehanging
Pull-test every bracket and reset any that move
Near the sea, wipe hardware with fresh water before cycling it
From the Journal
All articlesFAQ
Air it for several days first, then look for mildew staining, weakness in the fabric at hems, and corrosion at brackets and in mechanisms. Fabric that seems ruined on the first day is often much better after a week of airflow, so do not condemn anything immediately.
Sometimes, on synthetics. Scattered spotting on a polyester or acrylic fabric will often wash out or fade to acceptable. On natural fibres the staining is usually permanent, and fabric that feels papery at the hem has lost structural strength and will fail again.
August or early September. October is the busiest month of the year for every workshop in the state — houses reopening, guesthouses preparing, families refreshing for Diwali — and lead times stretch accordingly. Ordering during the rains gets you a quiet workshop.
Yes. Humid air deposits a film that dulls colour without being visible on its own — it only becomes obvious when something washed hangs next to something that was not. End-of-season washing is worth doing across the board.
The India Meteorological Department's normal withdrawal date for the state capital is 14 October, later than the end of September many people assume. October still brings rain, often as afternoon storms, and humidity remains high through the month. Plan to air the house in early October and wash large items once the weather settles.
Reline when the face fabric is still strong and only the lining has marked, which is common because the lining faces the damp wall. Replace when the fabric tears or feels papery at the hem, or when staining has set into a natural fibre. Relining a weakened curtain usually means paying twice.
Wipe the track, brackets and any mechanism with a cloth dampened in fresh water, dry them, then run every curtain or blind through its full travel several times. A white powder on aluminium usually cleans off. Rust on steel fittings does not, and those are worth replacing before the dry season.
Not straight away. A wall that held moisture through the rains needs to dry fully first, particularly in older laterite and lime-plastered houses. Sealing paint over a damp patch traps the water and pushes it elsewhere. Clean off growth, let it dry, and use a breathable finish compatible with the wall.
Keep reading