Drapehaus
Preparing the room
Drapehaus
Preparing the room
For villa owners furnishing or refurbishing a whole property at once
Doing a villa room by room as budget allows is how most properties end up looking assembled rather than designed. Fabrics are discontinued between phases, hardware finishes stop matching, and the whole-house consistency that makes a property feel considered never happens.
Typically eight to twelve weeks from survey to completion for a full property, longer if motorised treatments need power run before decoration.

A whole-villa scheme specifies everything at once against one palette and one hardware finish, then phases the installation to suit your access and budget. The specification is recorded so that in three years a replacement matches what is already there.
It also lets us solve the property as a system. The stairwell window that needs motorising, the west elevation that needs solar control, the rooms that will be closed for monsoon — those are connected decisions, and they get cheaper and better when made together.
How it runs
What’s included
Not every project uses all of these. We scope against what the property actually needs.
Typically these homes
FAQ
Yes, and it is usually how it runs. The point is that everything is specified at once against one palette, so phase three still matches phase one. What causes mismatched properties is specifying at different times, not installing at different times.
It is the most common contract failure, so we plan against it — specifying from ranges with long production runs, recording the full specification in writing, and where budget allows holding a small reserve of face fabric on site for future repairs.
Both, along with seating, headboards and outdoor shade. Most villa schemes involve several of those, and coordinating them against one palette is a large part of why the result looks deliberate.
Eight to twelve weeks from survey to completion is typical. It runs longer if motorised treatments need mains power run before decoration finishes, which is why that decision has to come early.